Ubuntu Vision Background

The Blueprint

A master plan to decouple African intelligence from foreign dependency. We are building the physical and digital infrastructure for true sovereignty.

Why Sovereignty Matters

Today, 98% of African data resides on servers outside the continent. The models that shape our future are trained on values that differ from our own.

The Ubuntu Initiative is not just about building a computer. It is about reclaiming the right to define our own digital destiny. By anchoring our intelligence to our own energy source (Inga), we ensure that no external switch can ever turn us off.

"Intelligence without sovereignty is merely advanced servitude."

— The Ubuntu Manifesto

Core Infrastructure

Phase 1 Technical Specifications

The infrastructure requirements for Africa's first sovereign AI supercomputer, built for extreme efficiency and reliability.

Power Source

Inga 3 Expansion (4,800MW total capacity)

Run-of-River Hydro

  • 500MW dedicated to Ubuntu compute via PPA
  • 4,300MW surplus to DRC regional grid
  • 100% renewable, zero carbon emissions
  • Baseload capacity (24/7/365 availability)

Compute Target

FP16 precision for LLM training

10+ ExaFLOPS

  • Focus: African language models (Swahili, Hausa, etc.)
  • Training corpus: 10T+ tokens of African content
  • Custom silicon: NVIDIA H200/B200 class GPUs
  • Phase 1 target: 50,000+ GPU cluster

Cooling System

Congo River heat exchange

Closed-Loop Liquid

  • Direct liquid-to-chip cooling (DLC)
  • Heat exchangers using Congo River water
  • PUE target: <1.15 (industry leading)
  • Zero water consumption (closed system)

Connectivity

Multi-path redundant links

Terabit Fiber

  • Primary link: 1+ Tbps fiber to Kinshasa
  • Subsea cables via Muanda (Atlantic access)
  • Direct peering with African IXPs
  • Latency: <50ms to major African hubs

500MW

Dedicated Power

1.15

PUE Target

Tier IV

Reliability

100%

Renewable

Project Roadmap

The Roadmap to Sovereignty

A staged execution model designed for technical excellence and impact.

Phase 0 • Q1 2026

Initialization

Project structure established, legal framework finalized, and initial capitalization secured.

Phase 1 • Q3 2026

Pilot Cluster

Deployment of 10MW pilot facility at Inga III. Training of first sovereign models begins.

Phase 2 • 2027

Foundation Training

Scaling to 100MW. Full-scale training of pan-African foundation models on local infrastructure.

Phase 3 • 2028+

Continental Deployment

Integration with national grids and sovereign intelligence distribution across Africa.

Inga GPTONLINE

Powered by Ubuntu Intelligence

Inga GPT accesses real-time mission data. Mistakes possible.